0591 Bell Barn Restoration 825 Jordon Schneider Dan Loran 29 March 2010
29 March 2010 - Jordon Schneider, and electrician with Duce Electric of Fort QuAppelle installs wiring in the Bell Barn.
0592 Bell Barn Restoration 826 Evan Bell Dan Loran 29 March 2010
29 March 2010 - Electrician Evan Bell working inside the Bell Barn.
0593 Bell Barn Restoration 827 Scott Pletz
29 March 2010 - Another one of the Duce electricians, Scott Pletz, get ready to work in the Barn.
0594 Bell Barn Restoration 828 Craig Degelman Dan Loran 29 March 2010
29 March 2010 - Craig Degelman, of Duce Electric, inside the Bell Barn.
0634 Bell Barn Restoration 886 Dan Loran 6 April 2010
6 April 2010 - Roofers install roofing paper on the wooden planks of the Bell Barn roof.
Bell Barn efk 25 Nov 2009 007
The plumbing crew excavate under the north wall of the Cottage Washroom to install plastic drainage pipe from the interior of the building to the septic tank.
Bell Barn efk 25 Nov 2009 014
On the vast open prairie, winter winds can be particularly biting.
Bell Barn efk 7 Dec 2009 006
7 December 2009 - A team from R.J. Tulik and Son, Fort QuAppelle, excavate the septic tank hole just north of the Cottage Washroom.
Bell Barn efk 7 Dec 2009 009
The two part rectangular septic tank sites just beyond the hole being excavated north of the Cottage Washroom for this feature.
c0001-Bell-Barn-Restoration-343-Nov.5th-20091-Dan-Loran-5-Nov-2009
c0002-Bell-Barn-Restoration-332-Ken-Baker-Site-Supervisor-G.-Hahn-Contracting-Ltd.1-Dan-Loran-5-Nov-2009
c0003 Bell Barn Restoration 333 Roland Balch1 Dan Loran 5 Nov 2009
Roland Balch works on the Cottage Washroom site.
c0004 Bell Barn Restoration 334 Chris Hahn1 Dan Loran 5 Nov 2009
Chris Hahn zips up his coat to ward off some of the winds blowing across the open prairie
c0011 Bell Barn Restoration 3911 16 Nov 2009 Dan Loran
One of the crew members tightens the re-bar for the concrete foundation.