Bell Barn efk 25 Nov 2009 007


The plumbing crew excavate under the north wall of the Cottage Washroom to install plastic drainage pipe from the interior of the building to the septic tank. Pink styrofoam insulation is located along the interior of the concrete wall. (Source: Frank Korvemaker)


Lesia Design Inc.

Lesia Design is

Previous
Previous

0634 Bell Barn Restoration 886 Dan Loran 6 April 2010

Next
Next

Bell Barn efk 25 Nov 2009 014