0365 Bell Barn Restoration 533 Dan Loran 6 Jan 2010
6 January 2010 - With the snow removed, installation of the vertical timbers can commence. These will hold up the loft floor and roof structure. (Source: Dan Loran)
6 January 2010 - With the snow removed, installation of the vertical timbers can commence. These will hold up the loft floor and roof structure. (Source: Dan Loran)
Lesia Design is