0415 Bell Barn Restoration 6201 Dan Loran 28 Jan 2010
28 January 2010 - The joists for the loft floor are now being inserted into the slots left in the stone wall, while the other ends rest on the ring beam. (Source: Dan Loran)
28 January 2010 - The joists for the loft floor are now being inserted into the slots left in the stone wall, while the other ends rest on the ring beam. (Source: Dan Loran)
Lesia Design is