0425 Bell Barn Restoration 6301 Dan Loran 28 Jan 2010
28 January 2010 - The first of 14 vertical posts that will hold the ring beam for the roof is installed. The ends of the first series of joists for the loft floor rest on the lower ring beam. (Source: Dan Loran)