0425 Bell Barn Restoration 6301 Dan Loran 28 Jan 2010


28 January 2010 - The first of 14 vertical posts that will hold the ring beam for the roof is installed. The ends of the first series of joists for the loft floor rest on the lower ring beam. (Source: Dan Loran)


Lesia Design Inc.

Lesia Design is

Previous
Previous

0418 Bell Barn Restoration 6231 Dan Loran 28 Jan 2010

Next
Next

0430 Bell Barn Restoration 334 a Gerald Pletz Dan Loran 29 Jan 2010