w0204 Bell Barn Reconstruction 2033 Dan Loran 11 Sept 2009


At the 14 foot height the wall is leveled off and metal brackets are installed to hold the ring beam that will form the base for the roof's rafter system. (Source: Dan Loran)


Lesia Design Inc.

Lesia Design is

Previous
Previous

w0202 Bell Barn Reconstruction 2013 Dan Loran 11 Sept 2009

Next
Next

w0206 Bell Barn Reconstruction 2053 Dan Loran 11 Sept 2009