w0294 Bell Barn Restoration 3121 Dan Loran 26 Oct 2009
Concrete piles inside the Barn will support the wooden posts holding up the loft floor and roof structure.
w0300 Bell Barn Restoration 3221 Dan Loran 29 Oct 2009
29 October 2009 - Crew members from Hahn Contracting of Fort QuAppelle tamp the sand and measure its thickness.
w0316-Bell-Barn-Restoration-337-Nov.-5th-20091-Dan-Loran-5-Nov-2009
w0326 Bell Barn Restoration 3471 Dan Loran 6 Nov 2009
6 November 2009 - The first load of concrete is poured and spread onto the Bell Barn floor.
w0328 Bell Barn Restoration 3481 Dan Loran 6 Nov 2009
Men working inside the Barn spread and level the newly-poured concrete.
w0334 Bell Barn Restoration 3561 Dan Loran 6 Nov 2009
More concrete if dumped from the mixing truck into the pressurized hopper.
w0344 Bell Barn Restoration 3701 Dan Loran 6 Nov 2009
Another crew member guides concrete from the truck through the chute and into the hopper.
w0349 Bell Barn Restoration 3761 Dan Loran 6 Nov 2009
Near the end of the day, the floor has been poured and leveled by hand.
w0350 Bell Barn Restoration 3771 Dan Loran 6 Nov 2009
The final smoothening of the concrete is performed with machines that spin a four-bladed fan over the surface. (Source: Dan Loran)
wBell Barn efk 25 Nov 2009 010
25 November 2009 - After the floor has cured sufficiently, brackets to support the wooden posts for the loft floor are installed.