Bell Barn piles 27 Aug 2008 008w sign
Hahn Construction installed the new piles and grade beam in the fall of 2008
Bell-Barn-Oct.-22,-2008-002w-grade-beam
cement-into-beam-21-db-Sept-18,-2008
Indian Head Bell Barn CRW 9158 JFR web
Preparations are made to pour the grade beam on top of the piles to support the stone wall reconstruction
Landscaping fall 2007 Thor 115 1540 IMG1
Heavy construction equipment was used to redesign the new Bell Barn site, provide proper drainage, and a parking lot for visitors.
SIGN holes for site sign w Nov 23 07 Dayle Bowman
A crew drills holes for posts to hold the on-site sign.
sign-Bell-Barn-March-25,-2008-004w-sign
w Mulching
Rows of trees and shrubs are covered with plastic mulch.
w PFRA staff plant the new Shelterbelt 067e
PFRA staff plant trees and shrubs in the shelterbelt along the north side of the site.
w plowing the rows before planting
A tractor works the soil before the tree planting is undertaken.
w smoothing concrete in grade beam1 db Sept 2008
Smoothing the concrete in the new grade beam.
w spreading the mulch cover
PFRA staff lay the plastic mulch over the new-planted trees.
web Bell Barn in winter 2007 Dayle Bowman
The Bell Barn during the winter of 2007-08.